EBG HomeProductsServiceSystem IntegrationCustomer ProfileFeedbackContact UsOnline Enquiry


Power Control Centre
Motor Control Centre
Intelligent Electronic Devices
Allied Equipment
Tips for PCC Type TF
     Know Your PCC
     Receiving PCC
     Preserving PCC
     Install PCC System
     Extension Panel to PCC
     Cabling PCC
     Check before Energising
     Maintenance on PCC
     Routine Check
     Remove ACB from PCC
     Our Recemmendations
Tips for MCC type TQ
FAQs
Click Here For Online Seminar/Demo Request


 

    

Regular maintenance helps
Routine checks


  • Check tightness of bolted joints

    Prior to energisation

    Six months after load is connected

    One year after the second check and then once a year.

  • THIS IS VERY IMPORTANT FOR ALUMINIUM BUSBARS AND LINKS.

  • Inspect all wiring for wear and cuts.

  • Look for indications of overheating, arcing or insulation breakdown.

  • Inspect main and arcing contacts. Replace all worn out contacts.

  • Inspect all auxiliary and control circuits for desired functioning.

  • Grease ACB parts and carry out maintenance as per ACB Instruction Manual.

  • Grease racking screw and telescopic rails at least once a year. Use grease “HP-LETHON-2” OR “SYNTHOLUBE-20 of HJ Leach & Co.”

  • Inspect all door gaskets for wear. Replace where necessary.

  • Keep the switchboard free of dust. Use vacuum cleaner to remove the dust.

     


  •  Larsen & Toubro - Electrical Business Group