EBG HomeProductsServiceSystem IntegrationCustomer ProfileFeedbackContact UsOnline Enquiry


Power Control Centre
Motor Control Centre
Intelligent Electronic Devices
Allied Equipment
Tips for PCC Type TF
     Know Your PCC
     Receiving PCC
     Preserving PCC
     Install PCC System
     Extension Panel to PCC
     Cabling PCC
     Check before Energising
     Maintenance on PCC
     Routine Check
     Remove ACB from PCC
     Our Recemmendations
Tips for PCC type TF
Tips for MCC type TQ
FAQs
Click Here For Online Seminar/Demo Request


 

    

Received the switchboard at site?
Now please follow the instructions given below


  • Inspect the packing cases for any damage.

  • Open the packing cases and inspect the PCC.

  • Report any damage or loss of components to the transport carrier and lodge a claim with the insurance agency or inform L&T’s regional sales office.

  • Use crane for shifting the various sections. For this purpose, lifting channels are provided on top of panels. For selecting the length of the sling, follow guidelines specified here

  • If rollers are to be used for placing the sections on the foundation, retain the base plank to avoid damage to base frame.

     


  •  Larsen & Toubro - Electrical Business Group