EBG HomeProductsServiceSystem IntegrationCustomer ProfileFeedbackContact UsOnline Enquiry


Power Control Centre
Motor Control Centre
Intelligent Electronic Devices
Allied Equipment
Tips for PCC Type TF
     Know Your PCC
     Receiving PCC
     Preserving PCC
     Install PCC System
     Extension Panel to PCC
     Cabling PCC
     Check before Energising
     Maintenance on PCC
     Routine Check
     Remove ACB from PCC
     Our Recemmendations
Tips for MCC type TQ
FAQs
Click Here For Online Seminar/Demo Request


 

    

Regular maintenance helps
ACB Removal


  • Trip the ACB. Isolate all remote voltage sources. ENSURE THAT CONTROL CIRCUIT IS DE-ENERGISED.

  • Rack out the ACB to ISOLATED POSITION. Open compartment door. Pull out the ACB to maintenance position.

  • Position the ACB lifting truck in front of ACB. Put lifting sling around the ACB lifting lugs.

  • Remove nuts anchoring ACB to telescopic rails and lift the ACB carefully by raising lifting truck.

  • Push the rails inside and close the compartment door.

  • After removal, the ACB should be stored properly. Keep it covered with a polythene bag, free from dust.

  • While re-inserting the ACB, ensure that the ACB as well as all downstream feeder switches/isolators are open.

     


  •  Larsen & Toubro - Electrical Business Group