EBG HomeProductsServiceSystem IntegrationCustomer ProfileFeedbackContact UsOnline Enquiry


Power Control Centre
Motor Control Centre
Intelligent Electronic Devices
Allied Equipment
Tips for PCC Type TF
     Know Your PCC
     Receiving PCC
     Preserving PCC
     Install PCC System
     Extension Panel to PCC
     Cabling PCC
     Check before Energising
     Maintenance on PCC
     Routine Check
     Remove ACB from PCC
     Our Recemmendations
Tips for MCC type TQ
FAQs
Click Here For Online Seminar/Demo Request


 

    

How to take care of your PCC?
Regular maintenance helps


Precautions before starting maintenance:

  • Switch off incoming power supply before removing top plates and side covers. Lock out incoming power supply. For safe operations, rack out the incomer ACB to isolated position and lock it.

  • Measure voltage on busbars to ensure that busbars are de-energised.

  • Switch off the control supply.

  • Isolate remote control voltage souvrces.

  • Short all CT secondaries.

  • In case of shutdown on only one feeder, lock the upstream breaker in isolated position.

  • For safety of personnel, while working on busbars, provide temporary earthing using a metallic chain/strip near the work place. Remove this earthing only after the job is completed.

     


  •  Larsen & Toubro - Electrical Business Group