EBG HomeProductsServiceSystem IntegrationCustomer ProfileFeedbackContact UsOnline Enquiry


Power Control Centre
Motor Control Centre
Intelligent Electronic Devices
Allied Equipment
Tips for PCC Type TF
Tips for MCC Type TQ
     Know your MCC type TQ
     Receiving MCC
     Preserving MCC
     Install MCC
     Extension Panel to MCC
     Cabling MCC
     Check before Energising
     Maintenance on MCC
     Routine Check
     Remove unit from MCC
     Replace drawout Power
     Remove Doors of the MCC
     Remove ACB from the MCC
     Our recommendations
     Spare Parts
FAQs
Click Here For Online Seminar/Demo Request


 

    

Do not want to install the switchboard now?
No worry! Here’s what you should do to preserve the MCC in good condition


  • Open and inspect the MCC. Scratches on the MCC, if any, should be touched up with the paint supplied with it.
  • Repack the MCC.
  • Outdoor storage should be avoided. Store all cases indoors in a clean, dry and well ventilated place where seepage of water and condensation does not occur.
  • If civil construction is being carried out in the vicinity, ensure that the MCC is completely protected from debris and dust.

     


  •  Larsen & Toubro - Electrical Business Group