EBG HomeProductsServiceSystem IntegrationCustomer ProfileFeedbackContact UsOnline Enquiry


Power Control Centre
Motor Control Centre
Intelligent Electronic Devices
Allied Equipment
Tips for PCC Type TF
Tips for MCC Type TQ
     Know your MCC type TQ
     Receiving MCC
     Preserving MCC
     Install MCC
     Extension Panel to MCC
     Cabling MCC
     Check before Energising
     Maintenance on MCC
     Routine Check
     Remove unit from MCC
     Replace drawout Power
     Remove Doors of the MCC
     Remove ACB from the MCC
     Our recommendations
     Spare Parts
FAQs
Click Here For Online Seminar/Demo Request


 

    

Received the switchboard at site?
Now please follow the instructions given below


  • Inspect the packing cases for any damage.
  • Open the packing cases and inspect the MCC.
  • Report any damage or loss of components to the transport carrier and lodge a claim with the insurance agency and inform L&T’s regional sales office.
  • Use crane for shifting the transport sections. For this purpose, lifting lugs are provided on top of panels.
  • If rollers are to be used for placing the sections on the foundation, retain the base plank to avoid damage to base frame

     


  •  Larsen & Toubro - Electrical Business Group