1. Provide a small cabinet in every switchgear room to store:
a) Tools like screwdrivers, fuse pulling handle, chassis racking handles.
b) All reference drawings like General Arrangement Drawing, Scheme Drawing
c) Consumable spares like bulbs, fuses.
2. Do not use rewired HRC fuses. It may cause an explosion or arc, leading to a fire.